Bridge Beam Cracks

DISCOVER WHAT MAKES US BETTER

Problem

New bridge beams, when delivered to site, were found to have developed cracks whilst in transport.

Scope of Works

After presenting different products to the relevant authorities, it was decided that the cracks required epoxy injection.  This was achieved by using an ultra-low viscosity 2 part epoxy that was extremely strong, but also had some flexibility.  The product was chosen to enable full penetration into the cracks. Continuous pressure was applied to the injectors until the cracks could take no more product, allowed to set and then the beams were cleaned afterwards.

Project Details